#Orcheva HOW TO MAKE STEEMIT TRADITIONAL PATTERN INTO STEEMIT TSHIRT

hi all, today i will show you about how to make steemit logo from traditional art vector.
I draw it by manually using a pen which i draw in a paper.
My plan is make a t-shirt with steemit logo appears in front of the tshirt.
The art is base from traditional pattern actually.
Here is it:
IMG_2120.JPG

I'm using a simple tool to manually convert it to vector in corel draw on my pc. The tool is pen tool
PROSES 3.jpg

I draw piece by piece manually with the tool
PROSES 2.jpg

After all done, copy paste and resize it to steemit logo, then i put a same steemit colour on it
PROSES 4.jpg

PROSES 5.jpg

Last, put the vector on tshirt mockup, here's the result:
STEEMIT SHIRT.jpg

You can see the process in this video:

Thankyou to visit

H2
H3
H4
Upload from PC
Video gallery
3 columns
2 columns
1 column
18 Comments