Home Remodeling Progress - I've Been Very Busy

20170408_191735.jpg

Since spring made an early arrival this year, my efforts have been dedicated toward working on our house.

I made a wise decision and chose to blow insulation into the walls of the original 1906 portion of our home. Once that was complete, I replaced bad wood around the windows and sealed them tight with expanding foam, window wrap, and silicone sealant.

20170409_164046 (1).jpg

Then I covered the exterior in 1/4" fanfold foam board and taped the seams to create an additional weather barrier.

20170420_192704.jpg

After the foam board was done, I was able to put up my new vinyl siding.

While I was putting on siding, a crew was getting my garage floor ready to pour concrete.

Garage Floor 1.jpg

I came home from work one Friday to see that my new concrete was poured and floated out, ready to cure.

Garage Floor 2.jpg

Garage Floor 3.jpg

The work on my house is taking me a long time.

I work 50 hours each week at my job, and can only work on my house in little slivers of time, which gets really frustrating. But I am moving forward regardless, and I will post an update later. Thanks for viewing my post!

Siding West Side.jpg

ID Photo (1).JPG

H2
H3
H4
Upload from PC
Video gallery
3 columns
2 columns
1 column
15 Comments