Cabin progress.

Its been a hot few days in the sun working on the cabin, lots of breaks and tons of water necessary!
We have been working early mornings, relaxing during the hottest time in the afternoon and working again in the evenings when it cools off a bit.

Taking down the roof beams.
25DA9519-7CF0-4AB4-847C-C4E25675BD14.jpeg

76A40E57-8315-4305-AE2E-A8631341DD81.jpeg

EB0CF181-E598-41D3-8874-937917CDCBEE.jpeg

EC321882-62C4-4BC4-8C36-DA31EAB664E2.jpeg

After we got the roof beams down we dug out the wall posts and some 2x6’s to make the supports.
Measuring out the cuts on the support brackets.
B7482B6E-0963-4DD3-8849-F13A7C013C1B.jpeg

All measured out, two supports per 2x6
C5457831-327B-4CF4-83FB-4E4A01A36EDE.jpeg

Jay getting the support beams cut in two and cutting most of the main cuts.
0FBD6DCA-823F-4E84-B644-8DCA0AEAAED2.jpeg

Finishing off the cuts with the pull saw.
72A8B20B-1E85-48C5-8D87-47AFCBE848DE.jpeg

Done all the support brackets.
345A2BA1-59BA-4A79-B4A5-93A31BAE6758.jpeg

Getting it marked out to mortise the holes for the support bracket.
714ED879-50D7-419B-8FD6-AB28A00EF436.jpeg

Mortising the holes and some fine adjustments made with the chisel.
85037B96-907E-4201-AAEB-0F738F476B6F.jpeg

6725A089-B627-476B-A8C1-56F08A697900.jpeg

Fits perfect!
A50C2BEF-4FE7-43F2-8C11-A5C9D3BAAFEC.jpeg

3B9DE602-BCA8-4D28-811E-7B61A06990C8.jpeg

05025D22-7606-447C-AEE8-F100AAC9747D.jpeg
(not sure why my pictures are uploading sideways, someone please tell me, lol)

13E426FC-E702-4C69-A470-F9D3F4DAC381.jpeg

@leemlaframboise
@medic8553
#north-woods

H2
H3
H4
Upload from PC
Video gallery
3 columns
2 columns
1 column
7 Comments